Guangzhou LMS Machinery Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Zhu Yongdong
  • Company Name : Guangzhou LMS Machinery Co., Ltd.
  • Tel : 86-20-87319590
  • Fax : 86-20-87319225
  • Address : Guangdong,Gunagzhou,14ABC, West Tower, Dongxing Building, 488 Huanshi East Road, Guangzhou Province. China
  • Country/Region : China
  • Zip : 510075

Guangzhou LMS ceiling production line

Guangzhou LMS ceiling production line
Product Detailed
Guangzhou LMS ceiling production line 1)Hydraulic motor :22kw 2)Feeding motor: 2kw 3)Leveling machine motor: 4kw 4)Decoiler

Guangzhou LMSceiling production line

1.       Main composition equipment:

1)      hydraulic-cylinder : each one in 120T(for punched device), 80T(for molding) and 10T(for cutting the corner)

2)      Pinch roller feeding machine 1 set

3)      Balance feeder   1 set

4)      Run-out transmission machine  1 set

5)      600x600mm pneumatic orientation device 1 set

6)      1000 L oil case inside  1 set

7)      Water cooling device 1 set

2.       Supporting equipment

1)      700mm leveling machine, 5T decoiler   1set

2)      Transmission strap with length 4m

3.       Power equipment

1)      Hydraulic motor :22kw

2)      Feeding motor: 2kw

3)      Leveling machine motor: 4kw

4)      Decoiler motor: 3kw

4.       Precision

1)      dimension of finished product: 600*600mm

2)      tolerance of finished product dimension: +0/-0.1mm

3)      tolerance of parallelism: ±0.2mm

4)      tolerance of vertical: ±0.2mm

5)      tolerance of diagonal: ±0.3mm

6)      end rate: rate of finished products: more than 99%

5.       Product function

1)      Within 600mm with hole punching

2)      600x600mm full automatic punching and forming

6.       Electronic circuit equipment:

The whole production is control by PLC.

7.       The production flow drawing, please see the attached.8.       Production speed

480pieces/ hour for 600x600mm (with punching)

960pieces/ hour for 600x600(without punching)

9.       Guarantee

One year

10.   Price To be confirmed.11.   Payment term

The 30% by T/T in advance, 70% balance by T/T before shipment.

12.   Deliver time:

90 days

13.   The price is expiry at the end of Jun,2011.

Guangzhou LMS ceiling production line



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.